Please be advised, major drainage work begins today on Wellington Way, from Downing St to Sheffield Dr. This project will last approximately 2-3 weeks. A concrete drainage system (belly gutter) will be installed in a section of Wellington Way. Please be cautious when walking, riding or driving in this area. Temporary street closures may be necessary during this time.


